Date: September 2025
Location: Indonesia
Project Background
A construction contractor in Southeast Asia was tasked with drilling a 150-meter-deep water well for a rural community. Due to the rocky soil layers and the project’s tight timeline, the client required durable drill rods with stable performance. They chose Jinghe Water Well Drill Rods, known for their high-strength steel and precision-thread technology.
Step 1 – Preparation & Inspection
Before start to drilling, the crew inspected all rods. Thanks to Jinghe anti-wear thread design and smooth internal surface, each rod passed inspection quickly. Threads were lubricated, reducing startup time and ensuring longer service life.
Step 2 – Smooth Connection & Extension
During the drilling process, rods were connected section by section. Our precision-machined threads made alignment easy, preventing cross-threading and reducing connection time by 30%. Operators reported less torque loss and excellent fluid circulation through the hollow rods.
Step 3 – Steady Drilling Performance
As drilling advanced into hard rock formations, the rods delivered outstanding performance. Their high tensile strength minimized bending and breakage risk, while the optimized inner diameter ensured efficient mud flow to cool the bit and transport cuttings.
Step 4 – Safe Rod Removal
After reaching the target depth, rods were removed efficiently. Thanks to their wear-resistant surface treatment, all rods remained in excellent condition and were ready for reuse.
Results & Benefits
Customer Feedback
“We’ve used other drill rods before, but Jinghe drilling products truly stand out. The precision threads saved us time, and the strength of the rods gave us peace of mind in tough formations. We will definitely continue using them for future projects.”
🔹 Why Choose Jinghe Drill Rods?